rfmcdonald: (Default)
[personal profile] rfmcdonald
Global News' James Armstrong reports on the causes of today's subway stoppage at Dundas West station. It sounds as if much more extensive repair work will be needed, likely involving more subway stoppages. One only hopes the next ones are planned.

Subway service was suspended both ways between St. George and Ossington stations this morning after water and silt fell onto the tracks forcing the TTC to stop trains at Dundas West station.

The silt and rain water made its way to the track floor through a puncture of the tunnel by Metrolinx contractors working on the Union Pearson Express nearby.

“It came to the point where the wheels of the train were going to be obstructed by the silt,” Mike Palmer, the deputy COO of the TTC said.

The TTC patched up the puncture a few weeks ago, Palmer said. But overnight, something “shifted” leading to Tuesday morning’s closure.

Close to 100 people are working on cleaning up the debris, Palmer said. The TTC fully reopened Line 2 at approximately 3 p.m.

But that’s only a temporary solution. The TTC and Metrolinx crews are working on coming up with a permanent solution to plug the hole for the next two to three decades, Palmer said – but right now, they don’t know exactly how they’ll do it.
This account has disabled anonymous posting.
If you don't have an account you can create one now.
HTML doesn't work in the subject.
More info about formatting
Page generated Jan. 29th, 2026 01:58 pm
Powered by Dreamwidth Studios