Torontoist's Emily Macrae reports on what lessons, positive and negative, Toronto can take from Seoul's bringing a buried waterway to the surface.
Today, the Cheonggyecheon stream flows through almost 11 kilometres of downtown Seoul, but it spent much of the last century covered in concrete. As the city grew, the stream became increasingly polluted, until it was paved over in 1958.
When an expressway was built along the stream’s course in 1971, it seemed like local politicians had literally prioritized the circulation of vehicles over the water cycle.
However, between 2003 and 2005, the city invested $900 million (U.S.) to restore the stream and remove the elevated highway. Today, water once again winds through the downtown while the source is anchored by a large public plaza.
[. . .]
From an environmental perspective, the stream is only a partial victory. As activist and academic Eunseon Park explains, the stream bed is made of concrete, which limits integration with surrounding ecosystems and contributes to an expensive algae problem.
Socially, the project lacked public consultation and was instead pushed through by the mayor, intent on cementing his legacy before entering national politics.